| Engineering works for Highway 51 |
(Section Grenoble-Coynelle-Col du Fau, France) |
|
 |
|
|
 |
Location: |
Section Grenoble-Coynelle-Col du Fau, France |
Brief: |
Development of a highway and engineering works over 16 km |
Surface : |
|
Cost of construction: |
260 000 000€ (valued in 1998) |
Schedule : |
Beginning of road works in 1995, inauguration of first section (Grenoble-Coynelle) in 1999, architectural bid for second section Coynelle-Col du Fau 2001-2004 |
Client : |
AREA, Société des autoroutes Rhône-Alpes |
With : |
Gilles Perraudin |
|
|
|